Customization: | Available |
---|---|
Certification: | CE, ISO9001 |
Maximum Welding Thickness: | 5-10mm |
Still deciding? Get samples of US$ 5/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
WARNING
1.Do not expose MAPP/Oxygen cylinders on the sunshine, and do not to be closeto the fire.
2. Make sure Oxygen cylinder will not get touch with any kind of Oils, ln the casethe cylinder valvewas frozen, only use hot water or steam to heat , do not use flame.
3. Do not use out all the gas inside Oxygen cylinder, make sure there is residue gas keep the pressure 0.1~0.2 Mpa.
4.Do not use out all the gas inside MAPP cylinder, make sure there is residue gaskeep the pressure 0.01~0.03Mpa
User's Manual:
1, Please check every connection of the kit before using, make sure there is no leakage
2. Open the cylinder valves and adjust the pressure regulators , We suggest to adjust the output pressure for MAPP Gasto 0.1Mpa, and Oxygen output pressure to 0.5Mpa. You can also adjust based on your own situation.
3. After pressure set , Turn on the MAPP Gas knob firstly on the welding torch., and light the torch.
4. Turn on the Oxygen knob on the welding torch, adjust the flame. For copper tube welding, we suggest to use Neutral Flame(shown as below picture 1), not oxidizing flame or carburizing flame (see below picture 2 and 3).5, For normal size copper tube 6mm- 22 mm, we suggest to use nipple #
5.For bigger size copper tube - 22mm and above, we suggest to use nipple # 3.
6.After use, please turn of the oxygen knob firstly on the welding torch, then close MAPP Gas knob, Then, turn of thecylinder valves.